MAXIMISE YOUR COMMERCIAL APPEAL WITH SAFE, WELCOMING SPACES

ORGANISED WORKSPACES CAN CONTRIBUTE TO INCREASED PRODUCTIVITY

OUR SKILLED TEAM CAN MANAGE ANY COMMERCIAL CHALLENGE

MAXIMISE YOUR COMMERCIAL APPEAL WITH SAFE, WELCOMING SPACES

ORGANISED WORKSPACES CAN CONTRIBUTE TO INCREASED PRODUCTIVITY

OUR SKILLED TEAM CAN MANAGE ANY COMMERCIAL CHALLENGE

MAXIMISE YOUR COMMERCIAL APPEAL WITH SAFE, WELCOMING SPACES

ORGANISED WORKSPACES CAN CONTRIBUTE TO INCREASED PRODUCTIVITY

OUR SKILLED TEAM CAN MANAGE ANY COMMERCIAL CHALLENGE

CANALSIDE
CAFE.

Construction of a new steel framed single storey cafe building on piled foundations and reinforced concrete ring beams. Steel composite panels, finished with cedar boarding, and natural stone were used to clad the building. The accommodation consists of a dining area, servery area, kitchen, wc facilities, offices and store room. RAE BUILD also constructed an outside dining area with anti-slip decking and timber balustrades.

WOMBOURNE
LEISURE.

Remodelling of existing leisure centre changing rooms with a complete strip out of the shower and wc areas, and installation of new linear drainage channels. Whiterock to all walls throughout and new suspended ceilings, lighting and ventilation installed. Trespa cubicle systems and vanity units were erected along with new sanitaryware, anti-slip flooring and decorations. RAE BUILD also completed repairs to roofing and glazing.

CANALSIDE CAFE.

Construction of a new steel framed single storey cafe building on piled foundations and reinforced concrete ring beams. Steel composite panels, finished with cedar boarding, and natural stone were used to clad the building. The accommodation consists of a dining area, servery area, kitchen, wc facilities, offices and store room. RAE BUILD also constructed an outside dining area with anti-slip decking and timber balustrades.

WOMBOURNE LEISURE.

Remodelling of existing leisure centre changing rooms with a complete strip out of the shower and wc areas, and installation of new linear drainage channels. Whiterock to all walls throughout and new suspended ceilings, lighting and ventilation installed. Trespa cubicle systems and vanity units were erected along with new sanitaryware, anti-slip flooring and decorations. RAE BUILD also completed repairs to roofing and glazing.

CANALSIDE CAFE.

Construction of a new steel framed single storey cafe building on piled foundations and reinforced concrete ring beams. Steel composite panels, finished with cedar boarding, and natural stone were used to clad the building. The accommodation consists of a dining area, servery area, kitchen, wc facilities, offices and store room. RAE BUILD also constructed an outside dining area with anti-slip decking and timber balustrades.

WOMBOURNE LEISURE.

Remodelling of existing leisure centre changing rooms with a complete strip out of the shower and wc areas, and installation of new linear drainage channels. Whiterock to all walls throughout and new suspended ceilings, lighting and ventilation installed. Trespa cubicle systems and vanity units were erected along with new sanitaryware, anti-slip flooring and decorations. RAE BUILD also completed repairs to roofing and glazing.

ENTRUST
OFFICE REFURB.

RAE BUILD reconfigured the existing floor layout at Entrust’s Stafford-based premises with floor to ceiling dividing cupboards. The education and skills support services business offices also enjoyed new electrics, flooring and decoration. The intention was to divide the floor area to generate opportunities to lease available office space for our client. 

ENTRUST OFFICE REFURB.

RAE BUILD reconfigured the existing floor layout at Entrust’s Stafford-based premises with floor to ceiling dividing cupboards. The education and skills support services business offices also enjoyed new electrics, flooring and decoration. The intention was to divide the floor area to generate opportunities to lease available office space for our client. 

ENTRUST OFFICE REFURB.

RAE BUILD reconfigured the existing floor layout at Entrust’s Stafford-based premises with floor to ceiling dividing cupboards. The education and skills support services business offices also enjoyed new electrics, flooring and decoration. The intention was to divide the floor area to generate opportunities to lease available office space for our client. 

BEACONSIDE
LEISURE.

RAE BUILD’s refurbishment of the existing leisure centre included internal improvements and minor roof repairs. Refurbishment of the gymnasium area included new sports flooring, mechanical and electrical upgrades, decorations and the installation of the latest gymnasium equipment. Minor repairs to the sprung flooring in the dance studio were also carried out along with the replacement of all doors throughout the building.

SCI LAB
BUILD.

Design and construction works to turn existing industrial/commercial premises into a new laboratory glassware manufacturing facility for SciLabware Ltd. Refurbishment works were also carried out to the office and staff welfare facilities as well as new constructions in the factory areas which created a balance (calibration) room, flask and gauge room, engineer’s workshop, mezzanine storage and offices.

BEACONSIDE LEISURE.

RAE BUILD’s refurbishment of the existing leisure centre included internal improvements and minor roof repairs. Refurbishment of the gymnasium area included new sports flooring, mechanical and electrical upgrades, decorations and the installation of the latest gymnasium equipment. Minor repairs to the sprung flooring in the dance studio were also carried out along with the replacement of all doors throughout the building.

SCI LAB BUILD.

Design and construction works to turn existing industrial/commercial premises into a new laboratory glassware manufacturing facility for SciLabware Ltd. Refurbishment works were also carried out to the office and staff welfare facilities as well as new constructions in the factory areas which created a balance (calibration) room, flask and gauge room, engineer’s workshop, mezzanine storage and offices.

BEACONSIDE LEISURE.

RAE BUILD’s refurbishment of the existing leisure centre included internal improvements and minor roof repairs. Refurbishment of the gymnasium area included new sports flooring, mechanical and electrical upgrades, decorations and the installation of the latest gymnasium equipment. Minor repairs to the sprung flooring in the dance studio were also carried out along with the replacement of all doors throughout the building.

SCI LAB BUILD.

Design and construction works to turn existing industrial/commercial premises into a new laboratory glassware manufacturing facility for SciLabware Ltd. Refurbishment works were also carried out to the office and staff welfare facilities as well as new constructions in the factory areas which created a balance (calibration) room, flask and gauge room, engineer’s workshop, mezzanine storage and offices.