Burton and South Derbyshire College

Tetron Point, 21 William Nadin Way, Swadlincote, Derbyshire DE11 0BB

Toilet Refurbishment

Overview

RAEBUILD successfully completed the refurbishment of the toilet facilities at Burton and South Derbyshire College’s Stephen Burke Construction Academy campus in Swadlincote in January 2026. The project was undertaken to replace ageing facilities that had suffered from ongoing wear and tear, delivering a modern, durable, and hygienic environment for students and staff.

The Brief

Burton and South Derbyshire College required the refurbishment of an existing toilet block at its Stephen Burke Construction Academy campus to address ageing facilities and improve the overall user experience.

The brief was to create a modern, robust, and easy-to-maintain environment that would better meet the needs of students and staff while improving hygiene standards and durability.

The project required a full internal refurbishment and reconfiguration of the existing layout, incorporating new toilet cubicles, sanitaryware, wall finishes, flooring, and building services.

A key objective was to provide facilities that would withstand the demands of a busy educational environment while delivering a clean, contemporary appearance and ensuring full compliance with current standards.

The Solution

We undertook a complete strip-out of the existing toilet facilities before reconfiguring the space to accommodate a new, more efficient layout. Building works included the removal of two existing windows, with new brick and blockwork installed to create a more practical internal arrangement. New stud partitions were constructed to form four toilet cubicles, with associated alterations to plumbing and services to suit the revised layout.

The refurbishment incorporated full-height White Rock hygienic wall cladding, a new suspended ceiling, PolySafe safety flooring, and a new IPS walling system with stainless steel WC pans.

Additional improvements included a new trough sink arrangement, six hand dryers, upgraded electrical installations, and decoration to all associated woodwork. The result was a modern, durable, and easy-to-maintain facility designed for long-term use.

The Outcome

The completed project has transformed the existing toilet facilities into a modern, hygienic, and highly durable environment that better serves the needs of students and staff.

The upgraded layout improves functionality and user experience, while the use of robust materials and hygienic finishes ensures the facilities are well suited to a busy educational setting.

The refurbishment has significantly enhanced the appearance, cleanliness, and longevity of the toilet block, providing the college with facilities that are easier to maintain and more resilient to daily use.

Delivered successfully and to a high standard, the project represents a valuable investment in the campus infrastructure and the overall student experience.

Project Highlights

  • Full refurbishment of an existing toilet block
  • Delivered for Burton and South Derbyshire College
  • Complete strip-out of existing toilet facilities
  • Reconfiguration of internal layout to improve functionality
  • Removal of existing windows and associated brickwork alterations
  • New stud partitions forming four toilet cubicles
  • Alterations to plumbing and drainage services
  • Installation of four new stainless steel WC pans
  • New IPS walling system for a clean and durable finish
  • Full-height White Rock hygienic wall cladding throughout
  • New trough sink arrangement
  • Installation of six hand dryers
  • New suspended ceiling system
  • PolySafe safety flooring installed throughout
  • Electrical alterations and upgrades to suit the new layout
  • Decoration of all associated woodwork
  • Modern, durable, and easy-to-maintain facilities designed for long-term use