Burton Town Centre Campus, Lichfield Street, Burton on Trent, Staffordshire, DE14 3RL
RAEBUILD has delivered an extensive programme of refurbishment, remodelling and building improvement works across Burton & South Derbyshire College, transforming existing accommodation, upgrading essential facilities and creating improved environments for teaching, learning and administration.
The works covered multiple areas of the College estate, including the conversion of science laboratories into offices, the creation of new classrooms and specialist teaching facilities, toilet and stairwell refurbishments, fire door upgrades and the extensive refurbishment of the Riverside Building.
With many of the projects undertaken within a live educational environment, careful planning and close collaboration with the College’s Facilities team were essential to maintaining safe access, minimising disruption and ensuring the successful delivery of each scheme.
The College required a series of refurbishment and improvement projects to modernise existing facilities, adapt accommodation to changing educational requirements and bring previously unused areas back into productive use.
The programme included remodelling the first and second floors of the main building, creating a dedicated preparation kitchen for students with special educational needs (SEN), improving specialist Hair and Beauty teaching facilities and upgrading toilets, stairwells and fire doors.
Beyond improving the College’s facilities, the program supported wider educational objectives by creating practical learning environments that help prepare students for life beyond education. In vocational subjects, providing access to workplace-style facilities can help bridge the gap between learning new skills and applying them in a real-world context, building confidence, independence, and a clearer pathway towards future employment.
A significant element involved returning the first floor of the Riverside Building to teaching use after several years of being unoccupied, alongside improvements to the building’s fabric and energy infrastructure.
A key requirement throughout was to deliver the works efficiently while accommodating the College’s day-to-day activities, including the continued operation of an independent nursery within the Riverside Building.
RAEBUILD undertook a comprehensive programme of refurbishment and remodelling works, carefully coordinating each project with the College’s Facilities team.
Within the main building, former first-floor science laboratories were converted into modern office accommodation for HR, IT support, administration and senior staff. The works involved extensive strip-out, alterations to existing services and the creation of new office spaces. On the second floor, existing offices were stripped out and remodelled with new stud partition walls to reinstate classroom accommodation.
We also transformed former IT support rooms into a dedicated SEN preparation kitchen, designed to help students develop independent living and cookery skills. The new facility incorporates a large central island with multiple cookers and hobs, perimeter worktops and integrated sinks. Working with our specialist fabricator, we developed a practical extraction solution to overcome restrictions within the available ceiling space.
The Hair and Beauty Innovations corridor underwent a comprehensive refurbishment to create an environment that more closely reflects professional workplace conditions. Works included new walling, drylining, mechanical and electrical installations, suspended ceilings, flooring, decoration and new equipment.
Importantly, the improved environment supports the College’s vocational learning ambitions, providing students with a setting in which to develop practical skills and experience workplace-style expectations.
For school leavers and young people exploring their future, these opportunities can help build confidence, develop transferable skills, and give learning a tangible purpose, helping them take their next steps towards further training or employment.
At the Riverside Building, we completed an extensive first-floor refurbishment to bring previously unused accommodation back into service. The works included new radiant panel heating, electrical installations, flooring, decoration, fire doors, replacement windows and external door curtain walling. Improvements to the building fabric included new roof insulation and coverings, together with the installation of a rooftop solar panel array.
The programme also included complete toilet refurbishments within the main building and at the Swadlincote campus, incorporating new sanitary ware, hygienic White Rock wall cladding, timber cubicles, trough sinks, mechanical and electrical alterations and decoration.
Further improvements were undertaken to the North and South stairwells, with works carefully phased to maintain access and minimise disruption. The Principal’s stairwell also received new vinyl flooring, with the refurbishment completed in just four days against an allocated one-week programme.
Within the Motor Vehicle Unit, we carried out targeted fire door improvements, including replacement intumescent strips, new door closers and adjustments to existing ironmongery to support effective door operation and fire safety.
Throughout the programme, we worked closely with the College’s Facilities team to manage access, coordinate service isolations and maintain safe working areas. At the Riverside Building, particular attention was given to scheduling scaffold installation and construction activities around the operational requirements of the ground-floor nursery.
The completed programme has delivered significant improvements across Burton & South Derbyshire College, providing modernised teaching and office accommodation, enhanced specialist learning environments and upgraded facilities for students and staff.
The transformation of former laboratories and offices has enabled the College to make better use of its existing accommodation, while the new SEN preparation kitchen and refurbished Hair and Beauty facilities provide practical environments that support specialist education and skills development.
Beyond the physical improvements, the project demonstrates how investment in the learning environment can help create opportunities for young people. By providing facilities that support practical, vocational learning and reflect the world of work, the College can help students build the skills, confidence and independence needed to progress into further education, training and employment.
I’d retain the existing paragraph around project delivery, including completing on time or ahead of schedule and minimising disruption, as that’s an important part of our story too.
The Riverside Building refurbishment has returned previously unused teaching space to productive use, alongside improvements to the building’s fabric and energy infrastructure.
Upgraded toilets, stairwells and fire doors have also contributed to the ongoing maintenance, safety and functionality of the College estate.
Through careful planning, effective communication and close collaboration with the Facilities team, the individual projects were completed on time or ahead of schedule, with disruption to College activities kept to a minimum.
The programme demonstrates RAEBUILD’s experience in delivering a diverse range of refurbishment and building improvement works within operational educational environments, providing practical, high-quality facilities that support the College’s ongoing requirements.