Overview

RAEBUILD successfully completed the Weston Road Academy Classroom Replacement and Expansion Project in October 2024, delivering a new standalone modular classroom building to replace ageing mobile classrooms that had reached the end of their operational life.

The Brief

Weston Road Academy required additional teaching accommodation to support a growing pupil population and replace existing mobile classrooms that had reached the end of their useful life. The project formed part of a wider investment programme funded in part through Section 106 developer contributions linked to local housing growth.

A key requirement was to provide a modern, standalone classroom facility that would increase capacity while integrating sensitively within the existing school environment.

The proposed building needed to maximise available space on a constrained site, minimise visual impact on neighbouring properties, and avoid disruption to existing parking and playground facilities. The design also needed to deliver a sustainable, accessible, and future-proof learning environment with a minimum design life of 60 years.

The Solution

RAEBUILD was appointed through the Staffordshire County Council Modern Methods of Construction Framework to develop the design and deliver the project as Principal Contractor.

Working closely with the client and design team, we refined the Stage 3 design and delivered a new standalone modular classroom building using a high-quality timber frame construction system. The project included foundations, external envelope works, mechanical and electrical installations, internal finishes, and associated external landscaping.

As Principal Designer (Building Regulations) and Principal Contractor, we managed all aspects of compliance, safety, and construction delivery. Extensive planning, segregation measures, and traffic management arrangements were implemented to ensure the works could be safely completed within a live school environment with minimal disruption.

The Outcome

Completed in October 2024, the project has provided Weston Road Academy with a modern, vibrant, and functional learning environment that supports the school’s long-term educational needs.

The new facility has replaced outdated mobile classrooms with high-quality teaching accommodation designed to improve comfort, accessibility, and energy performance. Delivered on programme and within a live operational school, the building now provides additional pupil capacity while enhancing the overall educational offering available to the local community.

Through careful design, construction management, and stakeholder collaboration, the project was completed with minimal disruption to pupils and staff. The result is a durable, future-proof facility that will continue to benefit the school, its families, and the wider community for many years to come.

Project Highlights

  • Replacement of ageing mobile classrooms with a new standalone teaching facility
  • Delivered for Staffordshire County Council through the Modern Methods of Construction (MMC) Framework
  • Construction of a modern, energy-efficient classroom building designed for a 60-year service life
  • Increased pupil capacity to support local demand and housing growth within the area
  • We fulfilled the roles of Principal Contractor and Principal Designer (Building Regulations)
  • Timber frame construction incorporating sustainable building methods and materials
  • Full design development from RIBA Stage 3 through to construction and completion
  • High-quality internal learning spaces with modern mechanical and electrical installations
  • Accessible design compliant with current Building Regulations and educational standards
  • New external paths, landscaping, and associated infrastructure works
  • Comprehensive fire strategy and Building Safety Act compliance delivered as part of the design process
  • Construction completed within a live school environment with minimal disruption to pupils and staff
  • Extensive traffic management, safeguarding, and site segregation measures implemented throughout
  • Delivered on programme with practical completion achieved in October 2024
  • Created a vibrant, functional, and future-proof learning environment for pupils, staff, and the wider community

Client Feedback

A modular classroom block was constructed as the school’s existing mobile classrooms are reaching the end of their lifecycle. The team from RAEBUILD were professional, skilled and accommodating, creating a much needed vibrant and functional learning environment which the pupils and staff are very pleased with.

 

 

Sally Hancox - Weston Road Academy Headteacher