WORKS: DESIGN & CONSTRUCTION
APPROX. VALUE: £450K

Design and construction works to turn an existing industrial/commercial premises into a new laboratory glassware manufacturing facility for SciLabware Ltd, inclusive of all necessary building works and extensive M&E works to allow for new machinery to be installed. A new plant room was constructed on the side of the existing factory building. A large structural steel loading canopy was designed and installed to the end of the building above the roller shutter doors.

WORKS: DESIGN & CONSTRUCTION
APPROX. VALUE: £450K

Design and construction works to turn an existing industrial/commercial premises into a new laboratory glassware manufacturing facility for SciLabware Ltd, inclusive of all necessary building works and extensive M&E works to allow for new machinery to be installed. A new plant room was constructed on the side of the existing factory building. A large structural steel loading canopy was designed and installed to the end of the building above the roller shutter doors.

WORKS: DESIGN & CONSTRUCTION
APPROX. VALUE: £450K

Design and construction works to turn an existing industrial/commercial premises into a new laboratory glassware manufacturing facility for SciLabware Ltd, inclusive of all necessary building works and extensive M&E works to allow for new machinery to be installed. A new plant room was constructed on the side of the existing factory building. A large structural steel loading canopy was designed and installed to the end of the building above the roller shutter doors.

CONSTRUCTION

COMPLETED CANOPY

FACTORY INTERIOR

CONSTRUCTION

COMPLETED CANOPY

FACTORY INTERIOR

CONSTRUCTION

COMPLETED CANOPY

FACTORY INTERIOR

PLANT ROOM BUILD

MEZZANINE OFFICE

STAIRCASE STEELS

PLANT ROOM BUILD

MEZZANINE OFFICE

STAIRCASE STEELS

PLANT ROOM BUILD

MEZZANINE OFFICE

STAIRCASE STEELS

INDUSTRIAL BUILDINGS.

General construction works consisted of demolition works, reinforced concrete substructures, effluent drainage, ACO type channel drainage in existing floor slabs, a mezzanine structure internally, ventilation grilles in existing cladding, barriers for machines, Large complex M&E installations including 3 phase works, lightweight partitioning, doors, suspended ceilings, finishes, decoration works, and associated external works.

Refurbishment works were carried out to the office and staff welfare facilities and new constructions in the factory areas which created a balance (calibration) room, flask and gauge room, engineer’s workshop, mezzanine storage and offices.

INDUSTRIAL BUILDINGS.

General construction works consisted of demolition works, reinforced concrete substructures, effluent drainage, ACO type channel drainage in existing floor slabs, a mezzanine structure internally, ventilation grilles in existing cladding, barriers for machines, Large complex M&E installations including 3 phase works, lightweight partitioning, doors, suspended ceilings, finishes, decoration works, and associated external works.

Refurbishment works were carried out to the office and staff welfare facilities and new constructions in the factory areas which created a balance (calibration) room, flask and gauge room, engineer’s workshop, mezzanine storage and offices.

INDUSTRIAL BUILDINGS.

General construction works consisted of demolition works, reinforced concrete substructures, effluent drainage, ACO type channel drainage in existing floor slabs, a mezzanine structure internally, ventilation grilles in existing cladding, barriers for machines, Large complex M&E installations including 3 phase works, lightweight partitioning, doors, suspended ceilings, finishes, decoration works, and associated external works.

Refurbishment works were carried out to the office and staff welfare facilities and new constructions in the factory areas which created a balance (calibration) room, flask and gauge room, engineer’s workshop, mezzanine storage and offices.