APPROX. VALUE: £138K

This project was to refurbish and make structural alterations to the existing boathouse which had fallen into disrepair and was part of a wider project to improve the facilities within Tunstall Park for the local community. The client wished to present the building in a condition which attracted a private enterprise to run a commercial business on a Lease. The final fit out of the building was therefore excluded from this project.

Works included: demolition of existing walls; structural timber repairs to roof; complex roof timber installation; cleaning by specialist contractors; new security doors; replacement roof finishes; lime render; repointing with traditional lime mortar; stonework; heating; LED lighting and adaption of electrical installations; adapt drainage systems; decorations.

WORKS: HISTORIC REFURBISHMENT
APPROX. VALUE: £138K

This project was to refurbish and make structural alterations to the existing boathouse which had fallen into disrepair and was part of a wider project to improve the facilities within Tunstall Park for the local community. The client wished to present the building in a condition which attracted a private enterprise to run a commercial business on a Lease. The final fit out of the building was therefore excluded from this project.

Works included: demolition of existing walls; structural timber repairs to roof; complex roof timber installation; cleaning by specialist contractors; new security doors; replacement roof finishes; lime render; repointing with traditional lime mortar; stonework; heating; LED lighting and adaption of electrical installations; adapt drainage systems; decorations.

WORKS: HISTORIC REFURBISHMENT
APPROX. VALUE: £138K

This project was to refurbish and make structural alterations to the existing boathouse which had fallen into disrepair and was part of a wider project to improve the facilities within Tunstall Park for the local community. The client wished to present the building in a condition which attracted a private enterprise to run a commercial business on a Lease. The final fit out of the building was therefore excluded from this project.

Works included: demolition of existing walls; structural timber repairs to roof; complex roof timber installation; cleaning by specialist contractors; new security doors; replacement roof finishes; lime render; repointing with traditional lime mortar; stonework; heating; LED lighting and adaption of electrical installations; adapt drainage systems; decorations.

STRUCTURAL REPAIRS

TIMBER INSTALLATION

ROOF FINISHES

STRUCTURAL REPAIRS

TIMBER INSTALLATION

ROOF FINISHES

STRUCTURAL REPAIRS

TIMBER INSTALLATION

ROOF FINISHES

STONEWORK

SPECIALIST CLEANING

LIME RENDER

STONEWORK

SPECIALIST CLEANING

LIME RENDER

STONEWORK

SPECIALIST CLEANING

LIME RENDER

PROVEN TRACK RECORD. 

We had worked with Stoke on Trent City Council on previous projects including the refurbishment of historic buildings that they maintained. This project was awarded via an open tender basis with the success of collaboration on previous projects scoring highly.

Our role was of ‘Principal Contractor’ for the project having demonstrated that we have the capability and resources to do so when successfully tendering for the project. Specifically, we had also demonstrated that we had worked on heritage buildings for a period of over 30 years.

PROVEN TRACK RECORD. 

We had worked with Stoke on Trent City Council on previous projects including the refurbishment of historic buildings that they maintained. This project was awarded via an open tender basis with the success of collaboration on previous projects scoring highly.

Our role was of ‘Principal Contractor’ for the project having demonstrated that we have the capability and resources to do so when successfully tendering for the project. Specifically, we had also demonstrated that we had worked on heritage buildings for a period of over 30 years.